breaking up of the existing footway surfacing including the property accesses
breaking up of the kerbs
excavation and formation of the footways including the property accesses
installation of the road-side raised, rounded and transition kerbs made of concrete on a concrete foundation, with concrete back support and joint to the existing carriageway
installation of the property-side flush kerbs made of concrete on a concrete foundation with concrete back support, in the area towards the unsurfaced ground
installation of the frost-protection and crushed-stone base course
paving of the footways including the property accesses with rectangular concrete block paving in the colours grey (footway) and red (accesses)