site clearance – grubbing of shrubs and trees, taking up and disposal of existing track sleepers
relocation of sand lizards
closure of the existing culvert under bridge 1 and creation of a continuous embankment
rehabilitation of bridge 2 over the mill race
removal of the remains of bridge 3 over the mill race and reinstatement of the bank slope
construction of the footpath/cycle path between the turning head in the planned residential area „Wiesenblick“ and the footpath/cycle path parallel to the federal road B176, of approx. 260 m
ensuring vehicle access for the rear property by car via the new footpath and cycle path from the direction of the new residential area