preparation, decompaction and cleaning of the existing concrete surface
application of a bituminous profile levelling to close existing holes and to pre-shape the planned minimum crossfall of ≥1%
installation of the bituminous base and surface course
renewal of the verge on both sides
Full New Road Construction
Complete renewal of the superstructure
full-depth reconstruction of the transition areas at the start of construction, at the end of construction and in the area of accesses to achieve a level connection
full-depth reconstruction at two points, in order to lower the carriageway here to the now existing height level and to ensure the flooding of the road in the event of high water
in the lowered area, additional surfacing of the verge with turf grid stones, in order to counter the risk of scouring phenomena in the event of high water