milling off and re-asphalting of damaged spots in the carriageway area
replacement of the two-row channel of concrete channel blocks over a length of approx. 165 m
replacement of 5 road gullies
renewal of the paving bedding and repaving of the footways with rectangular concrete block paving in the colour grey (within accesses in the colour red) over a length of approx. 350 m
separation of the footways from the carriageway by means of raised concrete kerbs or, in the area of accesses, with rounded concrete kerbs, and from the properties by means of flush concrete kerbs